top of page
  • Writer's pictureNicole Curotto

Research Laboratory Cold Room

InstilBio Research Facility at Manchester University



We were approached by the customer to install a modular cold room into one of the research facilities at Manchester University.


We had a full team to make this install as efficient as possible so all hands on deck!


Stage 1 was to manoeuvre all of the panels up to the second floor.


Stage 2


All panels were arranged and protective covering was removed to begin the installation project. This equipment was a modular unit which comes in different sizes and is one of the more straightforward types of cold rooms available that we install.




Stage 3


Once all of the side panels had been secured it was time to assemble the roof pieces.




Stage 4


Once the room had been secured it was time to move on to the refrigeration. The team check the unit is pulling town and leave the room on test and make sure everything is working as it should.





Stage5


Once the room has passed the monitoring phase the team are happy to hand over to the customer.




If you have an enquiry regarding refrigeration equipment for your business please do not hesitate to get in touch.


Take a look at our installation video below!





Recent Posts

See All
bottom of page